空手ジャーナル|KARATEJOURNAL

沖縄空手、競技空手の最新ニュースと技術を紹介

Max power ct100 manual

  • このトピックは空です。
1件の投稿を表示中 - 1 - 1件目 (全1件中)
  • 投稿者
    投稿
  • #907582 返信
    Pekka
    ゲスト

    Max power ct100 manual
    .
    .
    Download / Read Online Max power ct100 manual >>
    http://www.cdo.cloudz.pw/download?file=max+power+ct100+manual
    .
    .
    .

    .
    Control panel and thruster control box f. Relay and control box connections diagra. CT 125 24V CT100 12V CT125 24V With electronic thruster control INSTALLATION OPERATION MAINTENANCE FROM SERIAL NO. CT 125 24V DO NOT LAMINATE THE AREA OF THE TUNNEL TO WHICH THE ELECTRICAL MOTOR SUPPORT WILL BE FIXED. MPOP8080 35031 Electronic Controller MPOP5701 315308 Fuse holder T2 for CT100 OPTI3091 35018. WARRANTY COVERAGE Introduction The purpose of this document is to set out the terms of warranty cover offered in relation to products purchased by the End User from Max Power or its approved network of resellers. All factory testing, diagnosis, repairs and replacements are performed at no charge to the End User. Enter your email address and check your inbox. Please check your email for further instructions. For any boat requiring official classification, bodies of approval should also be consulted at the earliest opportunity. In any case, all other bodies, governmental or otherwise, should be contacted to ensure conformity with legal regulations relating to the boat in question. A thruster turbine installed above its ideal position towards its minimum depth will lead to a progressive loss of performance. Whether vertical, inclined or horizontal, it is recommended to support the electric motor. The electric motor generates heat when in use. The zone in which the thruster is installed must therefore be dry and ventilated. If the thruster is installed using a dedicated battery bank, this must be as close as possible to the thruster in order to reduce voltage loss in the electric cables. In no case should flammable products be stored near to the electric components of the motor. Position the tunnel in the hull, mark the positions of the different components, as well as the areas that require laminating, then remove the tunnel. It is advisable to drill the tunnel before laminating it into position. To secure its position apply reinforced fibreglass filler to all areas, both inside and out, taking care to entirely fill the space between the hull and the tunnel. Once the filler has set on the outside, finish with a waterproof under coat, followed by sanding and application of a waterproof finish coat. In order to optimise the flow of water whilst sailing, and to avoid turbulence due to the tunnel, leave 1 to 4 cm of Finish these with several coats of reinforced filler in order to obtain the required hydrodynamic lines. Once all laminating work is complete, apply a watertight barrier. The motor support and the drive leg must be centered in the tunnel. In some cases it will be easier to mark and drill these holes BEFORE laminating the tunnel. Check that the propellers rotate freely, without resistance or friction. It is imperative that the holes and the screws remain free of sealing compound, otherwise there is a risk of an incorrect assembly of the parts. If there is too much, or too little play, unscrew the motor side coupling screw using an Allen key and readjust. Ensure that air can flow freely to allow the motor to cool whilst in operation. Insert the drive pin and propellers. Protect your hands during this operation to avoid risks of injuries caused by the edges of the propeller blades. It is possible to install protection grids, however, their installation may affect thruster performance. Excessive voltage drop will cause premature wearing of the relays and brushes. Special attention should be given to the quality, capacity and condition of your batteries, aswell as cable sections used. Ensure that all electrical connections are correctly tightened. Under no circumstances should any flammable products be stored next to the electrical components of the thruster. It is essential to install a manual battery isolator and if possible an electric battery isolator at the base of the thruster motor power line. CT100 PLUS USER GUIDE COMMUNICATING TOUCH SCREEN THERMOSTAT RTCOA logo sheet 7aug07 D I O L I N T A R F r S. CT100 INSTALLATION GUIDE Table Of Contents Getting Started. Interior View Installation Location Wiring . Getting Started Radio Thermostat. To avoid electrical shock and to prevent damage to the furnace, air conditioner, and thermostat, disconnect the power supply before installing or servicing the thermostat or any part of the system. Installation Guide CT100 Getting Started Interior View RESET WIRE TERMINALS A U X TOUCH SCREEN STATUS INDICATOR HVAC BATTERIES SELECTION SWITCHES BATTERIES COVER. Do not install the CT100 until all construction and painting is complete. This thermostat does not require leveling. Read instructions carefully before removing any wiring from an existing thermostat. Label all wires before disconnecting them form the existing thermostat. This can be done at the circuit breaker. Fan out wires so that they are aligned with their terminals. Position wires behind the CT100 and over the terminal area. Do not bunch wires behind the CT100. Feed any slack back into the wall opening. Do not use the filexlib.
    .
    Max power ct100 guide
    Max power ct100 handbook
    Max power ct100 handbok
    Max power ct100 manual lawn
    Max power ct100 manuaalinen

1件の投稿を表示中 - 1 - 1件目 (全1件中)
返信先: Max power ct100 manual
あなたの情報:





<a href="" title="" rel="" target=""> <blockquote cite=""> <code> <pre class=""> <em> <strong> <del datetime="" cite=""> <ins datetime="" cite=""> <ul> <ol start=""> <li> <img src="" border="" alt="" height="" width="">

2022/12/12